permits nationwide
This report scratches the surface. Atlas turns contractor permit activity into precise sales targeting and live market intelligence across every territory you sell into.
350M+ permits · 50 states · Updated daily
#622 nationwide, Bright OPS is a Top 7% permit leader with 7,792 projects and a CA-heavy footprint.
| State | Permits | Share |
|---|---|---|
| CA | 7,678 | 98.5% |
| MA | 66 | 0.8% |
| CT | 33 | 0.4% |
| FL | 7 | 0.1% |
| NJ | 2 | 0% |
| IL | 2 | 0% |
| OR | 1 | 0% |
| VA | 1 | 0% |
| OH | 1 | 0% |
| KY | 1 | 0% |
| Date | Location | Status | Value | Description |
|---|---|---|---|---|
| 2026-05-22 | STOCKTON, CA | APPLIED | $8,580 | E-permit: solar app application id - sa20260522-150-357-563-a residential - 4.92kw photovoltaic system main breaker replacement: - no battery backup units: - 1 |
| 2026-05-22 | CHULA VISTA, CA | APPLIED | $21,350 | Roof mount solar-module 15 optimizer 15 inverter 1 system size 5.925kw/dc 6kw/AC energy storage 1 200a/200mcb mpu |
| 2026-05-22 | SANTA ROSA, CA | COMPLETE | $39,598 | 5.265 kw roof mount photovoltaic solar system 13 modules with ess 10kwh |
| 2026-05-22 | SANTA ROSA, CA | COMPLETE | $27,666 | Installation of 3.28 roof mounted (8) panel photovoltaic system and (1) battery 10kwh energy storage system |
| 2026-05-22 | SANTA ROSA, CA | ISSUED | $25,160 | Photovoltaic roof mount: 36 modules; 14.76kw; existing main 125a; 2 solaredge batteries w bui 2026-05-22 ksaldivar approved revision: revised battery layout and slight photovoltaic panel layout change. No other changes indicated |
Bright OPS has pulled 7,792 permits since 2018 across 10 states, ranking #622 of 9,286 (Top 7%). Median job value is $25,400, with California accounting for 98.5% of permits (top state: CA).